Fontsize: [-] Text [+]

Optimized recycling of nutrients and minimization of greenhouse gases by humification of sludge in the Mekong Delta

by aquaplaner engineers for INRES Bonn University


The construction was completed in January 2012 for the batch scale experiments and in May 2012 for the pilot scale experiments. Until October 2012 time will be used for growing of plants and development of a sludge layer at the surface that experiments on steady-state-conditions can start at the beginning of the next dry season.


Batch scale experiments at Binh Doung (SIWRR) near Saigon:


12 humification basins for experiments on different sludge


Pilot scale experiments at Cai Sau near Can Tho


First application of sewer sediments

Building up sludge layer

Test of different plants for support of humification

Copyright © 2014 German Aerospace Center (DLR). All rights reserved.